27/02/2024
The expansion will cover over 50,000 square meters, adding an entire floor with new stores, a medical center, gastronomic spaces, a fun park, and two additional parking levels.
Recently, a significant milestone was achieved with the lifting of the central skylight, a structure covering 340 square meters.
The main challenge of this process was ensuring that the large structure, assembled on the ground, fit perfectly into its permanent location.
The lifting took place in the early morning hours of February 6th, with our assembly team using a 500-ton crane to position the skylight 78 meters away.
Another mission accomplished and stunning images captured.
Take a look!