For Jeceaba Power Plant built by VSB, a consortium that brings together two of the largest companies in the sector, Vallourec & Mannesmann and Sumitomo Metals, Brafer provided a total of 10 thousand tons of steel structures – for the lamination and melt shop buildings.
The plant’s lamination complex required special detailing, due to its tubular structures with welded and bolted conections, process made by a robot with a special automatic factory cut.
On the assembly of the entire VSB complex, more than 30,000 tons of structures were erected, with the participation of Brafer Civil Construction and Erections.